Yesterday
You have spent too much time here — try again tomorrow.
Perlach Plaza
Munich (DE)

NMP

Strong Basis
Perlach Plaza
Perlach Plaza
Perlach Plaza
Perlach Plaza
HOUSING / MIXED USE / URBANISM
Project dataView

Planning: AllesWirdGut

Project stages: 1–5

Client: Concrete Capital GmbH

Competition: October 2017 – 1st prize

Completion: October 2022

GFA: 54,000 m²

Team: Anna Kapranova, Arno Denk, Christine Bödicker, Daniel Pannacci, Eva Bírová, Felix Reiner, Ferdinand Kersten, Franziska Sturm, Jan Fischer, Johannes Windbichler, Jonas Wehrle, Julia Stockinger, Lena Waldenberger, Marko Aćimović, Markus Stürzenbacher, Michal Stehlik, Nikolaus Punzengruber, Ondřej Stehlík, Teodora Stanese, Till Martin

Landscape planning: Grabner Huber Lipp, Freising

Structural & building services engineering: Seidl & Partner Engineering, Regensburg

Fire protection engineering: Sacher Ingenieure, Munich

Structural physics: Greenline Energiedesign, Regensburg

Traffic planning and engineering: Stadt-Land-Verkehr GmbH, Munich

Client representation/ project management: ALPHA Projekt Partner, Munich

Perlach Plaza is a hub, a signboard, and a calling card. With its urban mixed use of retail, service businesses, restaurants, residential units (110 rental apartments, 104 student apartments), and a hotel, it has a central urban-design function in the development of the new KulturQuadrat center on Munich’s Hanns-Seidel-Platz.

The heart of the master plan is a 5,000 square-meter park, protectively lined by the surrounding buildings. On the inside of the mixed-use complex, 50,000 square meters of high-quality developed floor space was created, which directly connect the quarter with the subway system, a cultural center, and generous outdoor areas.

Design elements like gentle arches and inviting arcades make Perlach Plaza atmospherically relate to the market square outside and to the narrow streets and passageways of downtown Munich. The result is a quarter that has local authenticity with an identity-forming dimension. Urbanites and flâneurs will be able to discover for themselves the three-story plinth zone as a lively, high-quality, integrated ensemble—an urban transfer with a green heart and a Munich soul.

For passers-by, the three-storey plinth zone makes an important contribution to the identity-creating atmosphere and to the perception of the quarter as a high-quality coherent ensemble.

Photos: tschinkersten fotografie 2023, Illustrations: AllesWirdGut

LUD
2015—2021
Built
Munich (DE)
56.400 m²
56.400 m²
Built
2015—2021
Awarded / HOUSING / MIXED USE / Social Sustainability / URBANISM

Residential Quarter Ludlstrasse

Munich Freedom

NEU
2024
Planning
Freiburg (DE)
17.000 m²
17.000 m²
Planning
2024
HOUSING / Sustainability

Urban Living at the Former Cargo Station

Five Friends for Freiburg

TVG
2022—2030
Planning
Düsseldorf (DE)
106.500 m²
106.500 m²
Planning
2022—2030
Digitalization & BIM / High-rise / Hybrid Construction / MIXED USE / OFFICE & ADMINISTRATION / Sustainability

New Technical Administration Building

In the City, For the City

Wrong Time Zone

Rotate back