Yesterday
You have spent too much time here — try again tomorrow.
Health and Safety Center of the Samaritan Association
Vienna (AT)

GSZ

At home with the Samaritans
Health and Safety Center of the Samaritan Association
Digitalization & BIM / HEALTHCARE / OFFICE & ADMINISTRATION / Sustainability
Project dataView

Planning: AllesWirdGut

Project stages: tba

Client: Arbeiter Samariter-Bund Österreich Landesverband Wien

Competition: February 2024 – 1st prize

GFA: 21,500 m²

Team: Agron Deralla, Anna Dombi, Clara Gmeiner, Cristina Ghiorghiu, Karolína Pettíková, Kristina Mosor, Johannes Windbichler, Martin Brandt, Teresa Acimovic

Well-trained processes and routines are the hallmark of an organization’s professional operations. For the new Public Health and Safety Center of the Arbeiter-Samariter-Bund in Vienna’s Seestadt urban development area, our architectural concept meets the clear structure of the institution with an efficiently zoned architecture on the ecological pulse of the time.

To make the best possible use of the site, the design is based on a functional division into seven strips. The public area facing Seestadtstrasse offers space for seminar premises and occupational health facilities and, together with the prominent main entrance, establishes a direct connection to the surrounding area interspersed with large patches of greenery. The six other wings of the building fan out, corresponding to the structure and work processes of the Arbeiter-Samariter-Bund, into staggered areas for logistics, the head office and the ambulance base, as well as for deliveries, a truck garage and a container warehouse. The horizontal strips are connected by a central arterial accessway. At several points, it widens out into community areas like amenity zones, a dining hall, or meeting rooms. Aside from anchoring the Arbeiter-Samariter Bund’s presence the urban context, the orientation of the seven strips towards the forest and Seestadtstrasse also makes for a harmonious connection with nature. The sustainability concept for the building includes, apart from energy-neutral operation and the reduction of gray emissions, detailed provisions for thermal, acoustic, and visual comfort as well as for biocompatibility of the building materials employed.

The construction involves the use of locally sourced, recycled, natural materials and design articulation through prefabricated modules with high recyclability and flexibility of use. The solid-construction façade is realized with large-size window elements and, with so much daylight availability, enables versatile spatial-layout and floor-plan options in conjunction with lightweight, flexible partition walls. The primary energy and heating needs of the Public Health and Safety Center are reduced to a minimum through a combination of passive and active measures: A compact building volume ensures low transmission heat loss in winter, while solar shading and glare protection on both the out and inside provide for minimized heating-up in summer. At the same time, optimal natural daylighting also reduces the need for energy-efficient artificial LED lighting. With their solid construction, the building ceilings provide additional thermal storage mass that can absorb heat during the day and release it again during the night. Moreover, openable windows allow natural nighttime cooling. The retention roof, equipped with a photovoltaic system, also has a positive effect on the microclimate of the new Public Health and Safety Center in Seestadt.

In the new Public Health and Safety Center, the clear organizational structure of the Vienna Arbeiter-Samariter-Bund is given an architectural expression on the ecological pulse of the time.

Visualization: AllesWirdGut, Illustrations: AllesWirdGut, Model: mattweiss

NBD
2013—2017
Built
Wolfurt (AT)
28.900 m²
28.900 m²
Built
2013—2017
Awarded / OFFICE & ADMINISTRATION

Doppelmayr Headquarters

Global Village

ZIV
2003—2009
Built
San Candido (IT)
2.670 m²
2.670 m²
Built
2003—2009
Awarded / OFFICE & ADMINISTRATION

Civic Defense Center

All In One, One For All

HCC
2021
Planning
Mannheim (DE)
35.105 m²
35.105 m²
Planning
2021
OFFICE & ADMINISTRATION / Sustainability / Timber Construction

Hitachi Columbus Campus

Sustainable, simple, beautiful!

Wrong Time Zone

Rotate back